There are two basic ways to join parts in a steel building: welding and bolting. Both are safe when properly designed; the difference lies in where, and under what conditions, the work is done. In our system we keep welding to a minimum, carry out the welds that are needed in the workshop, and work with mechanical, bolted connections on site. Here is why.

Controlled conditions, verifiable quality

A good weld needs the right equipment, the right position, clean surfaces and a dry, wind-free environment. In the workshop these conditions are the same every day and welds are easy to inspect. On site, height, wind, moisture and cold directly affect quality.

Faster, more predictable erection

Parts drilled in the workshop and numbered in assembly order are fitted to their places on the drawing and bolted together on site. The preparation, waiting and inspection that site welding requires disappear, dependence on the weather drops and the schedule becomes more reliable.

A building open to change

A bolted connection can be opened when needed. That means the building can later be extended, parts of it changed or adapted to a new need. If planned in the design, it can even be dismantled and re-erected elsewhere.

The precondition: precise design and fabrication

For a bolted system to work, every part’s dimensions and hole positions must be accurate to the millimetre; there is no room for making things fit on site. That is why connection details are drawn at the design stage, the building’s parts are planned as a whole from the start and fabrication follows those drawings. Having engineering, fabrication and assembly in one team is what makes this precision possible.